Offered in four models, the Flowline EchoBeam series is the most reliable and easy to-use non-contact level sensor. Flowline’s 80 GHz radar technology is unaffected by most media, process or environmental factors, and the intuitive LevelTap App makes configuration simple.
These general purpose 80-GHz radar level sensor transmitters provide continuous level measurement up to 196.8’ (60m) for liquids with a 4-20 mA, HART, Modbus or SDI-12 signal output. The level sensor transmitter is wirelessly configured over Bluetooth via the free Flowline LevelTap App which enables you to see the level, verify the status, and manage the settings of connected level sensor transmitters from the safety of the ground or nearby catwalk. The level sensor transmitter measures liquid and solid media with a dielectric constant value ≥ 1.6, such as water, chemical or petroleum-based liquids, and pellet, grain, powder or aggregate solids.
Flowline offers a variety of installation solutions including adhesive fittings for non-invasive measurement through flat mount plastic or fiberglass tank tops; capped PTFE fitting adapters for extremely corrosive media; and adjustable 316 brackets for side wall or above tank mounting.
- 80-GHz technology provides reliable, maintenance-free operation
- Measures with significant dust, agitation, foam or low dielectrics
- Measures level height, air gap, tank volume or open channel flow
- Rugged PVDF antenna and enclosure for corrosive liquid or solids
- Shielded 10m PVC jacketed cable for corrosive level environments
- Zero dead band maximizes the potential fill capacity of small tanks
- Optionally measures through top wall of plastic or fiberglass tank
- Bluetooth wireless configuration via the LevelTapTM mobile App
| Fixed Deadband |
0" |
| Enclosure Material |
PBT-FR |
| Connection |
3 ANSI gimbal flange |
| Frequency |
80 GHz |
| Power |
12-30 VDC |
| Output |
4-20 mA, 2-wire with HART protocol |
| Beam Angle |
4° |
| Measurement Range |
0 - 393.7' |
| Enclosure Rating |
NEMA 4X |
| Transducer Material |
PFA |
| Display |
LCD, dot matrix |
| Accuracy |
± 2mm |